No Result
View All Result
Online EV Marketplace
No Result
View All Result

Charged EVs | Download case study: How JE Dunn overcame EV charging installation obstacles with scalable track busway

Dr.Ev by Dr.Ev
04/04/2025
in EV News
282 3
0
136
SHARES
1.2k
VIEWS
Share on Twitter


Sponsored by Starline.

You might also like

Rivian R2 ‘Will Underpin All Future EV Projects’ At Volkswagen

Cargo Ship Carrying Electric Vehicles Burns Off Alaska – The New York Times

Volvo Just Invented AI-Powered Seatbelts

JE Dunn Construction, one of America’s largest general contractors, decided to install an electric vehicle charging station in the parking garage next to its world headquarters in Kansas City, Missouri. JE Dunn faced the following challenges when designing the infrastructure to support the charging stations:

  • Installing power panels on the EV charging station walls would have been costly, disruptive, time-consuming, and very visible to drivers and pedestrians in the garage. There was also a lack of wall space to accommodate the panels.
  • The chargers were located a considerable distance (270 feet) from the distribution power panel, which would have required extensive cabling to create a circuit for each charger.
  • Power panels and traditional wiring did not allow for easy scalability when the customer was ready to install additional EV chargers.

While evaluating power distribution options, JE Dunn found an alternative solution in the Starline Series-S Track Busway–a splash-proof electrical track busway with ingress protection that makes it suitable for covered outdoor installations like a parking garage.

Check out this case study to learn how JE Dunn overcame its installation and scalability challenges by implementing Series-S Track Busway.





Source link

Tags: BuswayCaseChargedchargingDownloadDunnEVsinstallationobstaclesovercamescalablestudyTrack
Previous Post

History of Electric Vehicles I Electric Vehicles introduction I class 01 I electric vehicle I

Next Post

Douglas County PUD suspends higher rates at 2 EV charging locations – The Wenatchee World

Dr.Ev

Dr.Ev

Related Posts

Rivian R2 ‘Will Underpin All Future EV Projects’ At Volkswagen

by Dr.Ev
06/06/2025
0

Rivian R2's tech stack will underpin all future EVs at Volkswagen, according to a Rivian exec. VW's ID Every1 will...

Cargo Ship Carrying Electric Vehicles Burns Off Alaska – The New York Times

by Dr.Ev
06/06/2025
0

Cargo Ship Carrying Electric Vehicles Burns Off Alaska  The New York Times Source link

Volvo Just Invented AI-Powered Seatbelts

by Dr.Ev
06/05/2025
0

Volvo has revealed its new "multi-adaptive seatbelt" design, which increases occupant safety. The new seatbelt adjusts depending on the size...

$1.6B EV battery cell plant in Florence pauses construction over market uncertainty – The State

by Dr.Ev
06/05/2025
0

$1.6B EV battery cell plant in Florence pauses construction over market uncertainty  The State Source link

Next Post

Douglas County PUD suspends higher rates at 2 EV charging locations - The Wenatchee World

Online EV Marketplace

© 2025 Online EV

Navigate Site

  • Home
  • Buying Advice
  • Buy Domains
  • Videos
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
    • Privacy Policy
      • Terms of Service – Refund and Returns Policy
  • Buying Advice
  • Buy Domains
  • Videos
  • Contact

© 2025 Online EV