No Result
View All Result
Online EV Marketplace
No Result
View All Result

Tesla Planning Nine Semi-Truck Charging Stations From CA To TX

Dr.Ev by Dr.Ev
08/02/2023
in Tesla
280 5
0
137
SHARES
1.2k
VIEWS
Share on Twitter


Tesla is reportedly looking to build nine electric semi-truck charging stations along a route from northern California to the southern border of Texas.

You might also like

Tesla is improving this critical feature in older vehicles

Tesla Tried To Reimagine Door Handles. Here’s Where It Backfired

Tesla lands regulatory green light for Robotaxi testing in new state

According to emails seen by Bloomberg News, the EV maker is seeking nearly $100 million from the US to build the charging stations.

In emails to the Texas Department of Transportation between May and early July, Tesla executives proposed that each station be equipped with eight 750-kilowatt chargers for Tesla Semi trucks and four chargers for trucks made by its competitors. 

If the plan succeeds, it would result in a first-of-its-kind charging network in the US that would enable long-haul electrified trucking from Texas to California, the states where Tesla has a major manufacturing and engineering footprint. The charging stations would also enable regional-haul trucking in Texas, Arizona, and California.

Perhaps more importantly, the charging corridor would help Tesla connect its US plants with the factory it plans to build in the Mexican state of Nuevo Leon, which is just south of Texas’ border. 

Tesla Semi

70 Photos

The corridor would stretch from Fremont, California, to Laredo, Texas, right on the US-Mexico border. Stations between Fremont and Laredo would include Bakersfield (CA), Compton (CA), Indio (CA), Phoeniz (AZ), San Simon (AZ), Sparks (TX), and Fort Stockton (TX). The distance between Fremont and Laredo is approximately 1,800 miles (2,900 kilometers).

Tesla execs told Texas officials the corridor could qualify for federal grants that would be disbursed as part of the bipartisan infrastructure bill created to modernize US transit systems by building more EV charging stations for both passenger and commercial vehicles.

According to Bloomberg, Tesla asked Texas state officials to write a letter in support of its semi-truck-charging project to include in its funding application, which was submitted in June. Tesla would contribute $24 million in addition to the $97 million requested from the government.

Tesla has designed Megacharger charging stations specifically for the Semi. The company has deployed some Megachargers at its own facilities, including Gigafactory Nevada, and at distribution centers belonging to PepsiCo, the Semi’s first customer. 

The EV maker has also installed mobile Megachargers at some strategic spots on several occasions. However, Bloomberg‘s report suggests Tesla is now looking to build permanent Megachargers, as it promised when it unveiled the Semi in 2017. 



Source link

Tags: chargingPlanningSemiTruckStationsTesla
Previous Post

Webinar: The Future of Electric Vehicles (EVs): 2021 Outlook

Next Post

Charged EVs | Enevate teams with Korea’s JR to build a battery electrode manufacturing facility in the US

Dr.Ev

Dr.Ev

Related Posts

Tesla is improving this critical feature in older vehicles

by Dr.Ev
09/12/2025
0

Tesla is looking to make a big splash with Robotaxi in a new market, as the company was spotted testing...

Tesla Tried To Reimagine Door Handles. Here’s Where It Backfired

by Dr.Ev
09/12/2025
0

Electronic and flush-mount door handles are getting attention from regulators. Safety advocates are calling for change following several high-profile crashes...

Tesla lands regulatory green light for Robotaxi testing in new state

by Dr.Ev
09/11/2025
0

Tesla is looking to make a big splash with Robotaxi in a new market, as the company was spotted testing...

Lyft’s Robotaxi Era Has Finally Arrived

by Dr.Ev
09/11/2025
0

Lyft has always been the second-fiddle in the ride-hailing world. Its presence has always been shadowed by that of Uber—and...

Next Post

Charged EVs | Enevate teams with Korea’s JR to build a battery electrode manufacturing facility in the US

Online EV Marketplace

© 2025 Online EV

Navigate Site

  • Home
  • News
  • Buying Advice
  • Videos
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
  • Buying Advice
  • Videos
  • Contact

© 2025 Online EV